Back to Results

Similar Vehicles

Florida Fine Cars sold vehicle
  • Standard Equipment
  • Additional Specifications
1 LCD Monitor In The Front
600w Regular Amplifier
9 Speakers
Audio Theft Deterrent
Bluetooth Wireless Phone Connectivity
Graphic Equalizer
Real-Time Traffic Display
Streaming Audio
Window Grid Diversity Antenna
Black Grille w/Chrome Surround
Black Side Windows Trim and Black Front Windshield Trim
Body-Colored Door Handles
Body-Colored Front Bumper
Body-Colored Power Heated Auto Dimming Side Mirrors w/Power Folding and Turn Signal Indicator
Body-Colored Rear Bumper
Clearcoat Paint
Fixed Rear Window w/Defroster
Front Windshield -inc: Sun Visor Strip
Fully Automatic Projector Beam High Intensity Low/High Beam Daytime Running Auto-Leveling Directionally Adaptive Headlamps w/Delay-Off
Galvanized Steel/Aluminum/Composite Panels
Light Tinted Glass
Lip Spoiler
Perimeter/Approach Lights
Spare Tire Mobility Kit
Speed Sensitive Rain Detecting Variable Intermittent Wipers w/Heated Jets
Trunk Rear Cargo Access
Wheels w/Silver Accents
2 Seatback Storage Pockets
4 12V DC Power Outlets
Air Filtration
Analog Display
Cargo Area Concealed Storage
Cargo Features -inc: Spare Tire Mobility Kit
Cargo Net
Cargo Space Lights
Carpet Floor Trim and Carpet Trunk Lid/Rear Cargo Door Trim
Cruise Control w/Steering Wheel Controls
Day-Night Auto-Dimming Rearview Mirror
Delayed Accessory Power
Driver / Passenger And Rear Door Bins
Driver And Passenger Visor Vanity Mirrors w/Driver And Passenger Illumination
Driver Foot Rest
Engine Immobilizer
Fade-To-Off Interior Lighting
Fixed Front Head Restraints and Manual Adjustable Rear Head Restraints
Front And Rear Map Lights
Front Cupholder
Full Carpet Floor Covering -inc: Carpet Front And Rear Floor Mats
Full Cloth Headliner
Full Floor Console w/Covered Storage and 4 12V DC Power Outlets
Garage Door Transmitter
HVAC -inc: Underseat Ducts, Residual Heat Recirculation and Console Ducts
Illuminated Locking Glove Box
Integrated Navigation System w/Voice Activation
Interior Lock Disable
Interior Trim -inc: Carbon Fiber Instrument Panel Insert, Carbon Fiber Console Insert and Metal-Look Interior Accents
Leather/Metal-Look Gear Shifter Material
Leatherette Door Trim Insert
Manual Tilt/Telescoping Steering Column
Memory Settings -inc: Driver Seat and Door Mirrors
Outside Temp Gauge
Perimeter Alarm
Power Fuel Flap Locking Type
Rear Cupholder
Remote Releases -Inc: Power Cargo Access
Sport Leather Steering Wheel
Systems Monitor
Tracker System
Valet Function
15.9 Gal. Fuel Tank
3.46 Axle Ratio
4-Wheel Disc Brakes w/4-Wheel ABS, Front And Rear Vented Discs, Brake Assist and Hill Hold Control
90-Amp/Hr 900CCA Maintenance-Free Battery
Dual Stainless Steel Exhaust w/Chrome Tailpipe Finisher
Electric Power-Assist Speed-Sensing Steering
Electro-Mechanical Limited Slip Differential
Engine Auto Stop-Start Feature
Engine Oil Cooler
Engine: 3.0L Inline 6-Cylinder M TwinPower Turbo
Front And Rear Anti-Roll Bars
Gas-Pressurized Shock Absorbers
Multi-Link Rear Suspension w/Coil Springs
Rear-Wheel Drive
Regenerative 210 Amp Alternator
Sport Tuned Suspension
Strut Front Suspension w/Coil Springs
Airbag Occupancy Sensor
Curtain 1st And 2nd Row Airbags
Driver And Passenger Knee Airbag
Dual Stage Driver And Passenger Front Airbags
Dual Stage Driver And Passenger Seat-Mounted Side Airbags
Outboard Front Lap And Shoulder Safety Belts -inc: Rear Center 3 Point and Pretensioners
Rear Child Safety Locks
Side Impact Beams
Tire Specific Low Tire Pressure Warning

2015 BMW M3
$35,000

*Price excludes Taxes, tag, title, registration fees, government fees, electronic filing fee of $897 (not required by law) and dealer service fee of $1,299 (not required by law) are additional and not included in vehicle price . See below * for details.

  • Stock # 119772
  • Vin WBS3C9C59FP805469
  • Year 2015
  • Make BMW
  • Model M3
  • Trim
  • Style Sedan
  • Mileage 27,194
  • Color DAYTONA VIOLET METALLIC / SILVERSTONE FULL LEATHER
  • Transmission Standard
  • Engine 3.0L INLINE 6-CYLINDER M TWINPOWER

Disclaimer

*Taxes, tag, title, registration fees, government fees, electronic filing fee of $897 (not required by law), and dealer service fee of $1,299 (not required by law) are additional and not included in the vehicle price. Applicable transfer/shipping fees are due in advance of vehicle delivery and are separate from sales transactions. Price assumes that the final purchase will be made in the State of Florida, unless the vehicle is non-transferable. Vehicle subject to prior sale. A lot goes into Florida Fine Cars prices. We combine data from the local market with this car's mileage, features, and inspection findings to arrive at the most competitive price possible for this vehicle. These charges represent costs and profit to the dealer for items such as inspecting, cleaning, and adjusting vehicles, and preparing documents related to the sale. Our policy includes 3-Day Return and 5-Day Exchange policies for vehicles up to 7 years old and less than 80,000 miles. While great effort is made to ensure the accuracy of the information on this site, errors do occur, so please verify information with a customer service representative.
This is easily done by calling us at 305-384-6340 or by visiting us at the dealership.

Topgo to the top
Hi! 👋 Do you have any questions?